Clothing & Textile Sector Projects

Fabrication of 30,000 Ltrs. AbovegroundTank with Pump

MAS Girithale

Completed in - January 2018

Subcontracted to Rio Lanka Engineering. Client requirement – to fabricate 30,000 Ltrs storage tank for fuel with installation of GPI AC 230v Heavy Duty Pump and GPI mechanical flow meter with a covering box.

 

 

 

Special pointouts of the Project
  • Fabrication of 30,000 Ltr Above Ground Fuel Storage Tank
  • Installation of GPI AC 230V Heavy Duty Pump with a Cover Box

Other Clothing & Textile Sector Projects